Check out just some of our amazing construction work across the Northern Territory.

Hilton Mitchell St.

Location – Darwin, NT

Duration – 12 weeks

 

Full demolition of hotel rooms right through to re fit. Installation of new cabinetry, bathroom upgrades, installation of loose furnitre. BTC Constructions managed this project from start to finish.

kfqnx6gi3ns80qjmvfqp.jpeg
m35021_Darwin_Airport_by_day72-e1458798578333.jpg

Terminal Control Centre

Location – Darwin International Airport

Duration – 10 weeks

 

Full project management of all trades within a tight time frame. BTC delivered this entire fit out on time, safely and within budget. From a bare shell to a full operating control centre for the terminal.

Darwin Golf Club
Gaming Room

Location - Marrara, Darwin
Duration - 6 weeks

 

Internal fit out of gaming room,entrance way, outdoor area, timber feature covered ceilings, decorative timber screening and panels.

BTC Constructions - Capability Statement -9.jpg
Ih-Darwin-Area-Comum.jpg

International
House

Location - Darwin CBD
Duration - 6 weeks

 

Project Management of Internal fit out and construction of 8 classrooms, a large common area including toilet, fire and mechanical upgrades all to meet 9b classification. External facelift and upgrades to meet client’s needs.

Coffee Club

Location - Oasis Shopping Centre, Palmerston
Duration - 4 weeks

 

Internal fit out including wall and ceiling framing, sheeting and flushing. Furnishings included timber veneer panels, Perspex screenings and cabinetry install. screening and panels

BTC1-880x570.jpg
BTC Constructions - Capability Statement -12.jpg

Beachfront Hotel
Bottle Store

Location - Nightcliff, Darwin
Duration - 2 weeks

 

Internal fit out completed with minimal disruption to trading. With BTC as project managers, we completed the demolition, new vinyl plank flooring, perimeter bulkhead and paint. Finished with new cabinetry, entrance way and new colour scheme and signage. The outside received new paint and signage also.

Welcome Centre - Tiwi Islands

Location - Tiwi Island, Northern Territory
Duration - 3 weeks

Supply and install of roofing iron, external cladding, windows and flashings. Logistically testing because of the remote location, BTC was still able to deliver the project on time and on budget.

BTC Constructions - Capability Statement -13.jpg
ice-58917-68210600_3XL-807209.jpg

DoubleTree by
Hilton

Location - Alice Springs, Northern Territory
Duration - 12 weeks


BTC were engaged as construction manages for the refurbishment of 235 rooms. Scope included demolition of rooms installation of all cabinetry, stone vanities, bathroom fit outs, installation of loose furniture and furnishings.